by Gautam Patnaik | Mar 18, 2017 | 2017, News
Assembly of ‘Statue of Equality’ statue began in JIVA, Shamshabad. 10 engineers from Aerosun Engineering, China came to the site on March 6th and started working on assembling of gajarajas – elephants. All the tools required for assembly such as...
by Gautam Patnaik | Feb 27, 2017 | 2017, News
The Shilpi Stone work in and around Bhadravedi site has begun. Bansipahadpur Pink Stone is being used to construct the masonry around the Bhadravedi site. The stone is being brought all the way from Bansipahadpur, Rajasthan. The first truck load of the pink stone has...
by Phani Kumar | Feb 1, 2017 | 2017, News
01/02/2017JIVA HH Chinna Jeeyar Swamiji inspected Statue of Equality construction site accompanied by Mr. Rameshwar Rao. He interacted with site engineers and workers and enquired on progress and developments. Currently, the team is working on the fabrication and 750...
by Phani Kumar | Jan 16, 2017 | 2017, News
Yes, its time to rejoice. Third consignment has arrived the JIVA campus consisting the divine feet of Ramanujacharya Swamy. The load has been carefully unloaded and stored. The 4th and 5th shipments have reached Chennai port. Due to Pongal holidays the...
by Phani Kumar | Jan 10, 2017 | 2017, News
A thousand years ago Bhagavad Ramanujacharya walked 130 km eighteen times to receive esoteric meanings from His Acharya only to immediately reveal it to all those who desired. Sixty years ago, HH Pedda Jeeyar Swamy braved all odds to build Ashtakshari Kshetramin...